Quantcast
Jump to content


Hisun Sector 250 Conversion


Aaron

Recommended Posts

Welcome to the forum Aaron!

The exhaust could easily be moved, although it would probably cost a couple hundred bucks if you had it done. Much cheaper if you have access to a pipe bender, and a welding torch.

What about just using bed mounted seats instead? They're easily removed, so you can still use the bed for hauling. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By didgeridoo
      Hello, All!  I've decided to replace the traction batteries in my 2018 Sector E1 with a 48V Lithium set. They may be expensive, but I figure the Discovery Dry Cell are, too. I am not looking for the max driving range, as I have never received near the brochured range to begin with, but a good mix of charge/ get work done/ charge is what I am expecting.
      I have settled on the 48V EAGL kit from bigbattery dot com. Each battery pack provides 30Ah. The kit ships with a charger, as well. The packs would be physically connected in parallel (using a busbar) to one another, maintaining the 48V voltage, but together would be able to provide the amp draw the buggy pulls when going up hill or towing a rake (rated 320 max continuous Amps). This is in comparison to the serial connection the eight 6V lead batteries. Each of the EAGL batteries looks to have its own BMS; am I correct in thinking I will have to use their included charger rather than (simply) changing the onboard charger to lithium mode? The chemistry of the pack is LiFe PO4, for what it's worth.  I haven't torn anything apart yet (to diagram), so  I am not sure how the dash will interpret the AMP draw, but the kit I am looking at includes a dash mounted charge indicator.
      If anyone has completed a similar conversion, do you have any tips? Specifically, how did you remove the original batteries, and how did you secure the new ones? I am guessing that almost any change from the stock batteries would involve at least some modifications. Any tips would be appreciated, especially things I may have failed to consider. Thanks!
    • By John M in Louisiana
      Quick question about replacing the plug.  One of the prongs pulled out, so I'm thinking it will be an easy fix to connect the old cord with a new plug but I'm unsure about the specs.  15amp 125v?  Is it more complicated than that?  I do plan to buy a plug that's water tight.
      Thanks in advance!
    • By John Gubancsik
      I'm having trouble finding a replacement battery for my UT400.  Has anyone bought one and where did you get it?  Thanks.
    • By felo72
      Hello all. I purchased a brand new Massimo Buck 250 EFI in June for our farm and I've had the parking brake fail on me twice. I have approximately 250 miles on the vehicle. The first time was less than a month after receiving the UTV. We all of a sudden lost brake pressure and it would not start. I tracked the issue back to the parking brake. Upon removing the chain cover, I noticed the brake pad was missing and the caliper piston was touching the rotor. I found a set of brake pads online and replaced them myself. It's worked for several months and just happened again. Seems like a design flaw. I'm reaching out to see if there's an upgrade option available, or if I should replace the entire caliper with the brake pads? Thanks in advance for any advise.
      I submitted a warranty claim, so I'll keep this updated with what Massimo replies.
      When I replaced the brake pads the first time, back in July, my Son made a video on YouTube to show the unique caliper design. Here's a link if you wanted to check it out:
       


    • Fast Free Shipping on All Orders Over $50
    • By A P
      Hi
      I have a 2022 hisun sector eps 550. 30amp fuse is blown for eps. Checked the motor and it’s fine. Opened up the controller and found a bad diode. Dealer wanted 500$ for the controller. Just posting this in case it helps someone. I couldn’t read numbers from the old one so just took a guess and replaced it with a 100v 3amp diode. 
×
×
  • Create New...