Replacing A-arm Heims joints
-
Similar Topics
-
By Greg Kilgore
I would really like to know what you guys think about this. I'll try not to ramble and make it as clear as I can.
I took this new job with companyX as a fiber splicer a year ago. I have a 45' bucket truck and 10or12 x 8 ft enclosed splice trailer I have to take home. Within the last 6 months all the management in the splice dept left. Now the power/construction management and higher ups are filling in. Just recently we were told travel to our 1st job is not payable even though we are in a company vehicle.
We are union so I asked the union business manager about this. His reply was be grateful you were paid travel as long as you were and that you don't have to drive your POV to the job.
Last week I had 50hr total. The job area is 4-4.5 hrs away. My time was reduced to 44.5 hrs since we were told this travel thing on Tuesday of that week. I wasn't hired for this area. I was hired for area a lot closer to home.
Pay is good. Work is not hard. Insurance is through the union and so far pretty good.
But I hate the thought of having to work extra just to make a 40hr paycheck. Anyone who has to drive as part of their job knows windshield time is not easy.
Anyway what do you guys think. Should I look for a different job or just suck it up because of the decent pay and health insurance.
-
By Randyh79
Just bought a Bad Boy Bandit 750. Need to change the oil and filter. Any suggestions would be greatly appreciated. I'm pretty sure this a Hisun 750 Sector even though it says it's a Bad Boy. I'll include pics soon.
-
By buckrub
Hey guys! Newbie here. I'm an old man who's better with plowing a mule (4-legged kind) than these newfangled beasts. I, and a friend of mine, just bought new Coleman sxs and are having to finish the assembly. I've been reading on this site and I'm falling on the mercy of you experts. The only way I'm an expert is that an "ex" is a has been, and a spurt is a drip under pressure. LOL First off, the 2 buggies have no ignition switches. They seem to mount on the dash, not the opening in the steering wheel shaft cover, so we ordered new ones that are supposed to fit. They are 8 inches long, and have a 4-wired white plugin which is slightly rectangled when looking at the end of the plug. The trouble is there's nothing to plug into. There is a three-wire grey plug close enough to reach the four-wire plug, but of course, they are not compatible.
Secondly, the blinker, light, ect. unit on steering wheel just spins around when touched. I see no way in heaven or earth to secure it. I've looked at a diagram on the Powersports site, but can't detect how it mounted. Fellows I'd be so grateful for any help with this. Me and my mule will even plow your garden for free, for your help. LOL
-
By CYJSP2009
Dear Friends,
2022 Brand new Joyner CV Axles and CV Joint rebuild kits are comming
1. S650.03.02.02.00 ---Joyner 650 Commando Rear
2. TR1100.03.01.03.00 --- Joyner Trooper Front
3. TR1100.03.02.03.00 --- Joyner Trooper Rear
4. D650.03.02.02.00 --- Joyner 650 Sand Spider Rear Left
5. D650.03.02.03.00--- Joyner 650 Sand Spider Rear Right
6. SV800.03.02.01.00 --- Joyner 800 Viper, SV1100 Drive shaft Left
7. 14274 --- 650 ider rear left, rear right, 800 MV; 800Viper, SV1100 Drive shaft rear left and rear right outer cv joint rebuild kit
8. 15803 --- 650 Sand Spider rear left, rear right, 800 MV; 800Viper, SV1100 Drive shaft rear left and rear right outer cv joint rebuild kit
Attached are the part photos for reference.
Above parts are now on the way to USA, will be ready for inland delivery in middle of July.
Price: CV Axle: USD250/ Piece; CV Joint kit (without grease): USD110 send to door.
There will be special discount availabe for deals completed within July 2022.
Buy 1 piece: Get 5% discount,
Buy 2 pieces: get 10% discount.
Buy 3 pieces: get 15% discount,
Buy 4 and more than 4 pieces: get 20% discount.
Please kindly note Qty for each part is not big and it is hard to forcast when there will be next offer for these kind of products unless there is sufficient confirmed order qty for productioin arrangement.
Payment method: Payoneer payment link ( can pay through bank account or credit card) or Paypal ( [email protected]) . Payment commission paid by the buyer.
Interested parties, please contact [email protected].
Thanks
Good Luck
Casey / Leaf Asia
July-07-2022
-
By Xov
Just received delivery of a 2024 AMP Pro. Thought I'd start a thread with my impressions as I use it and learn more. There doesn't seem to be a whole lot of real-world usage information out there on this model. Hope this will help others as they research.
Intended Use Cases
Fire mitigation / slash removal from a 5 acre forested and well-gamble-oaked property. The previous owners thought as much about fire mitigation as I do about fashion: not much. Snow removal Stump pulling General hauling (rock, lumber, etc.) Weimaraner energy depletion. Wasn't an original use case, but a nice added bonus. Experiences So Far
Wasn't impressed that two of the bumpers on the underside of the bed where it sits upon the frame were missing. The metal on metal contact has damaged the powder coating and the frame. I expect a little better QC.
I've only put a few hours on it, so not a ton to report on usage. It isn't quiet; it's silent. I can't even detect an electric note from the motor. I removed (and subsequently replaced) the motor cover noticed that the motor is German and made by Schambuller. The motor controller is Italian and made by Dana TM4. Given the operating specs of both I found on the web, I suspect both are higher quality than the previous Navitas (which is supposed to be decent). The motor is rated at 25 hp and 71.5 lb-ft of torque. It feels very powerful. All the torque is delivered instantly, if desired.
The bed is huge and has an electric dump as standard. Great feature but would like it to go up a bit more. Probably not feasible from an engineering perspective, but I want and I need ;).
Power steering is nice, but vague. Probably common to many UTVs, but I am accustomed to more direct results from input. Plan early and plan often.
In our first full day of usage, we hauled about 1/2 as much slash as the entire rest of the year when I was doing it by hand cart. I may get fatter, but I'll also get more done. After a few days of usage, the battery meter has gone down by 1/10th.
Until next time...
-
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.