Quantcast
Jump to content


Outdoor thread


Recommended Posts

Well, any hunters around here? i assume so.

that time is closing in on us. Dove season opens 9/1, and white tail opens, 11/4, i believe,

The pigs are here year round tho...

 

 

More videos here, https://www.youtube.com/channel/UCujZlrZtdMkpeCqDForApPQ/videos , i plan on doing more videos of wildlife as well.

A destructive hog i shot last night.

20210824-193953-1.jpg

 

 

Link to comment
Share on other sites

  • 4 weeks later...
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By didgeridoo
      Hello, All!  I've decided to replace the traction batteries in my 2018 Sector E1 with a 48V Lithium set. They may be expensive, but I figure the Discovery Dry Cell are, too. I am not looking for the max driving range, as I have never received near the brochured range to begin with, but a good mix of charge/ get work done/ charge is what I am expecting.
      I have settled on the 48V EAGL kit from bigbattery dot com. Each battery pack provides 30Ah. The kit ships with a charger, as well. The packs would be physically connected in parallel (using a busbar) to one another, maintaining the 48V voltage, but together would be able to provide the amp draw the buggy pulls when going up hill or towing a rake (rated 320 max continuous Amps). This is in comparison to the serial connection the eight 6V lead batteries. Each of the EAGL batteries looks to have its own BMS; am I correct in thinking I will have to use their included charger rather than (simply) changing the onboard charger to lithium mode? The chemistry of the pack is LiFe PO4, for what it's worth.  I haven't torn anything apart yet (to diagram), so  I am not sure how the dash will interpret the AMP draw, but the kit I am looking at includes a dash mounted charge indicator.
      If anyone has completed a similar conversion, do you have any tips? Specifically, how did you remove the original batteries, and how did you secure the new ones? I am guessing that almost any change from the stock batteries would involve at least some modifications. Any tips would be appreciated, especially things I may have failed to consider. Thanks!
    • By Ridge Runner
      Hi
      i have a 2019 Coleman 550 Outfitter.  The tail gate has a pin on each side, that snaps into latch blocks that are mounted on the inside of the tail gate opening.  There are two M6x16 pan head screws(bolts?) that hold the latch blocks in place.  The screws enter from inside the bed body, and I can’t figure out how to access them.  This is right by the tail light assemblies.  I tried taking a pan head screw out of the fender lip, but found out there is not a nut firmly inplace, to hold the pan head screw in.  Bottom line I’m making it worse.  
      coleman was no help.  If I could figure out how they attached the tail light, then maybe I could put the latch screws in through the tail light hole.  Any ideas?
       
      thanks
      Ridgerunner
    • By REDfletching
      Spent today at a Honda dealership looking at their 520 side by side, then on the way home past our Lowes noticed they had several new UTVs on site, so we U-turned and ducked in there. We were impressed that all that came for $9,999 metal whole length skid plate, nice sized bed, roof, windshield, side mirrors, winch, upgrade looking tires… all of which would have added thousands of dollars to an already expensive Honda 520. Now Honda does have a great reputation from my trusted UTV experienced buddy, so it has that going for it.
    • Fast Free Shipping on All Orders Over $50
    • By Greg Kilgore
      I would really like to know what you guys think about this. I'll try not to ramble and make it as clear as I can.
       
      I took this new job with companyX as a fiber splicer a year ago. I have a 45' bucket truck and 10or12 x 8 ft enclosed splice trailer I have to take home. Within the last 6 months all the management in the splice dept left. Now the power/construction management and higher ups are filling in. Just recently we were told travel to our 1st job is not payable even though we are in a company vehicle. 
      We are union so I asked the union business manager about this. His reply was be grateful you were paid travel as long as you were and that you don't have to drive your POV to the job.
       
      Last week I had 50hr total. The job area is 4-4.5 hrs away. My time was reduced to 44.5 hrs since we were told this travel thing on Tuesday of that week. I wasn't hired for this area. I was hired for area a lot closer to home. 
       
      Pay is good. Work is not hard. Insurance is through the union and so far pretty good.
      But I hate the thought of having to work extra just to make a 40hr paycheck. Anyone who has to drive as part of their job knows windshield time is not easy.
       
      Anyway what do you guys think. Should I look for a different job or just suck it up because of the decent pay and health insurance.
×
×
  • Create New...